INDUSTRIAL MACHINE,

Saskatoon, Saskatchewan January 2003 -

Move 22-ton vertical boring mill across floor; move over hole, lower and level for final assembly

 

AT SASK-TEL BUILDING, Saskatoon, Saskatchewan

March 2003 -

Move 15,000-pound chiller, in three pieces, down two flights of stairs and reassemble in the

mechanical room.

 

Special sliders, running on soaped blocks and planks, made the stairs a simple matter

 

WAVECOM ELECTRONICS, Saskatoon, Saskatchewan Winter 2002-03 - This piece was removed from an enclosed semi-trailer, transferred to a flat trailer, rotated onto its side to get through the doorway, then stood up in the building, using a gantry system.  With very limited ceiling height, the unit had to be fitted

between the roof trusses to be raised to vertical position.  This very sensitive equipment was moved across a soft vinyl floor on steel plates and specialty rollers

 

HITACHI INDUSTRIES, Saskatoon -

January 2003 - Lift a 25-ton plate roller out of pit, load onto semi-trailer and move from one building to another at Hitachi.

 

AT CANADIAN LIGHT SOURCE, SYNCHROTRON BUILDING,

Saskatoon, Saskatchewan

March 2003 - Move 4,000 lb. isolation table in Synchrotron building, using pallet jack with “fifth wheel” to carry

 and steer front end.

 

ADM Agri-Industries, Lloydminster -Removed 175-ton seed conditioner from railcar and placed in plant in May 2007

 

CNH-Saskatoon  Moved 750-ton press into plant at Saskatoon, Saskatchewan in 2006

SASKATOON, SASKATCHEWAN, CANADA

Contact us at (306) 244-6550 or wiebemovers@shaw.ca

Wiebe Movers Ltd.

Wiebe Movers Ltd. is a structural and industrial moving company specializing in large and unusual moves

1000-ton press relocated within plant in Saskatoon, Saskatchewan. The press weighed 95 ton and was lowered into a 2-foot deep pit to keep the operator at floor level